The first stage for the construction of a Panthers Concrete Tank is site preparation.

  • Tanks must be constructed on natural level solid ground
  • We recommend 50mm thick layer of gravel or road base
  • Site must be properly compacted and laser levelled foundation
  • Tanks can be constructed above or below ground. Above ground requires concrete pump at additional cost. Tanks also out of the ground more then 800mm also require a concrete pump at additional cost.
  • There must be sufficient access for trucks. Require 5 metre wide truck set up point near hole.
  • Prior to excavation we recommend calling us if you require further information or site inspection.
  • Once the concrete tank is constructed you must take care when backfilling around the tank to keeps its structural stability.
  • Overflow pipe to be diverted away from tank base
  • Tanks fully in the ground must never be empty. Once the tank is completed, fill the tank with a minimum of 25%.
  • Empty tanks are buoyant. Do not let water on the outside of the tank in the excavated hole build up as the tank will float.
  • Do not put excavated soil on hole edge. Keep 1 metre clear around hole edge for construction

Resource Download

Click on the below link to view the site preparation information.

Site Preparation and Excavation Information – Built on Site

We recommend contacting us prior to commencing site preparation to confirm details.

Please contact us for all custom tank excavation details.